
Supporting Service
CMM Programming
Request a quote for a new or revised part program.
Request a quotation
StandardISO/IEC 17025:2017CoverageMissouri and the Greater Midwest
Programs that measure what the drawing requires
Running without error and measuring what the drawing requires are two different outcomes, and a program can achieve the first without the second. GD&T is interpreted from the print or model first: datum structure, feature control frames and alignment strategy are worked out before a point is taken.
Programs are written offline or online on PC-DMIS, Calypso, MODUS, CAMIO, PolyWorks or Quindos, matched to the platform already running on the customer's machine.

What is built into the program
Fixture and feature access, probe and stylus selection, and scanning versus discrete-point strategy are decided against the tolerance stack, not the fastest path through the part.
- 01
Datum and alignment
Datum structure and alignment strategy are built from the GD&T callouts, not a best-fit default.
- 02
Probe and stylus qualification
Stylus configuration is selected for access and qualified against the reference sphere before the program runs.
- 03
Scanning vs. discrete point
Scanning mode is specified where form data is required; discrete points where it is not.
- 04
PPAP and first-article output
Report formats are built for AS9102 first article inspection and PPAP submission requirements.
How a program is built
- 01
Print review
Datums, tolerances and feature control frames are read before CAD import.
- 02
Strategy
Alignment, fixturing and probe path are planned against the tolerance, not the geometry alone.
- 03
Build and dry run
The program is built, collision-checked and run dry before touching the part.
- 04
Validation
Output is checked against a known part or CMM report before release.

Why Kansas City CMM Calibration and Repair
- 01
Platform matched to shop
Programs are written on the platform already installed, not one requiring new software.
- 02
GD&T read before CAD
Datum structure comes from the print's feature control frames, not an automatic best-fit.
- 03
Report format fits the submission
AS9102 and PPAP formatting is built into the output, not reformatted after the fact.
Coverage across Missouri and the Greater Midwest
On-site scheduling is organized by region. Travel time and routing affect the date offered, particularly outside the Kansas City metro.
Discuss CMM Programming Requirements
Send the print, model and platform in use.